Sidewalks are constructed and the road is paved on the urban block 81
On Monday the director of “Geoinzhenering”, Musadik Beqiri held a press conference with the journalist in which he inaugurated the start of the pavement of the road in the Urban Block 81.
“Following the activities of the Municipality of Tetovo for improving the infrastructure and regulate the urban city blocks, intensively has been worked on the urban block 81”, said Beqiri.
According to him in this urban block sidewalks has been constructed with a length 262 meters, while on Monday have started the work on paving the road with a surface from 1 thousand and 700 meter square.
The sidewalk construction and road pavement, with a total value of 3 million and 733 denars, include the first part of the work on this block. The second part of the work will include the regulation of that part in all modern standards.